Different Delay Analysis Techniques

A number of claims analysis techniques have been introduced with varying degree of results accuracy and some often offer favorable outcome to the claims proponent, consequently, arising the difficulty for both sides to reach an agreement. The Time Impact Analysis (TIA) has been recognized by practitioners and researchers to produce the most reliable and unbiased results. The drawbacks of this method, however, are its complexity to perform and the stringent requisite of having well-maintained and relevant project documentations.

Different Delay Analysis Techniques Read More »

Building Information Modelling: The Future of Project Management

BIM-projects realised cost savings, faster delivery time, and overall improvements in productivity and quality of works through better collaboration of stakeholders and having a centralised repository of information. Several countries in Western Europe, North Americas, Asia, and other parts of the world have already adopted the use of BIM. It is a project management tool. It encompasses all aspects of project management. However, it requires involvement and competency of stakeholders to be effective.

Building Information Modelling: The Future of Project Management Read More »

Schedule Risk Analysis With Acumen: Effects of Floats And Lags on Results

In this analysis, the effects of the schedule total floats and lags on SRA results are investigated. Four simple schedules were developed using Primavera P6 to understand how results varied when the same single risk was applied to a critical activity, non-critical activity, and to an activity whose criticality was driven by a lag.

Schedule Risk Analysis With Acumen: Effects of Floats And Lags on Results Read More »

Schedule Risk Analysis With Acumen: Different Activity Status

In this analysis, different activity status (completed, in progress, not started) are investigated on how each affects the SRA output. A simple schedule was developed using Primavera P6 for a straightforward understanding of the relationship between the inputs and the SRA results generated from Acumen.

Schedule Risk Analysis With Acumen: Different Activity Status Read More »

A Simple Interactive Project Timeline

There is no better way to vividly express key events and milestones than to visually presenting them in images. The Project Timeline does that. Though developed in Microsoft Excel, it still has the dynamic functionality. Meaning, displayed photos and other details can be changed as simple as by moving the installed scroll bar.

A Simple Interactive Project Timeline Read More »

Schedule Risk Analysis With Acumen: Different Activity Types

In this analysis, the activity types are varied while holding all other parameters constant. These activity types include Task Dependent, Level of Effort, WBS Summary, and Milestones. A simple schedule was developed using Primavera P6 for a straightforward understanding of the relationship between the inputs and the SRA results generated from Acumen.

Schedule Risk Analysis With Acumen: Different Activity Types Read More »

Milestones Tracker: An interactive project monitoring and reporting tool

Having reliable reporting tools are vital in properly managing construction projects. One such instrument is the Milestone Tracker as developed by this author. The tracker provides comprehensive information about the overall status of the projects. Details are configured in such as way that they can readily be conveyed and easily understood by various stakeholders.

Milestones Tracker: An interactive project monitoring and reporting tool Read More »

Schedule Risk Analysis With Acumen: Different Calendars

In this analysis, the effects of activity calendars in the SRA outputs are investigated. Activities are assigned with different calendars while holding all other parameters constant. A simple schedule was developed using Primavera P6 for a straightforward understanding of the relationship between the inputs and the SRA results generated from Acumen.

Schedule Risk Analysis With Acumen: Different Calendars Read More »

Schedule Risk Analysis with Acumen: Varying Activity Constraint Type

In this analysis, the activity constraint type is varied while holding all other parameters constant. A simple schedule was developed using Primavera P6 for a straightforward understanding of the relationship between the inputs and the SRA results generated from Acumen.

Schedule Risk Analysis with Acumen: Varying Activity Constraint Type Read More »