Rationalizing the Irrationalities in Decision-Making

Traditionally, decision-making was seen as a rational process governed by logic, with emotions viewed as disruptive. Yet, recent studies reveal emotions are essential to organizational decision-making, especially in complex scenarios. Emotions, distinct from moods, shape judgments and persist beyond the moment, influencing future decisions. They act as motivators and guide adaptive choices, with both immediate and anticipated feelings present throughout the process. Neuropsychological research further shows that lacking emotional input can impair decision quality, even if rational skills remain strong. Ultimately, emotions and rationality are intertwined, both crucial for effective decisions.

Read More »
MLR Project Management & Consultancy

Mastering Activity Codes in Primavera P6 Schedules for USACE and NAVFAC Contracts: Requirements, Common Pitfalls, and Best Practices

The article outlines the significance of utilizing specific activity codes in Primavera P6 schedules for US government projects, particularly under USACE and NAVFAC contracts. USACE typically requires eight detailed codes, while NAVFAC may only use a subset. The content stresses the necessity of reviewing contracts for compliance and notes potential exceptions. It highlights common mistakes and offers guidance on applying these codes effectively, ultimately illustrating their role in enhancing schedule management and ensuring successful project execution.

Read More »
Power Bi Dashboard by MLR

Dashboard: Solar PV Installations In Australia

The dashboard provides a rich collection of data carefully put up together to provide an interactive source of information pertaining to the solar PV state of the country including a predictor tool to forecast the installation quantity based on several relevant parameters as determined by regression analysis.

Read More »
Delay Analysis by MLR

Different Delay Analysis Techniques

A number of claims analysis techniques have been introduced with varying degree of results accuracy and some often offer favorable outcome to the claims proponent, consequently, arising the difficulty for both sides to reach an agreement. The Time Impact Analysis (TIA) has been recognized by practitioners and researchers to produce the most reliable and unbiased results. The drawbacks of this method, however, are its complexity to perform and the stringent requisite of having well-maintained and relevant project documentations.

Read More »
Building Information Modelling: The Future Of Project Management

Building Information Modelling: The Future of Project Management

BIM-projects realised cost savings, faster delivery time, and overall improvements in productivity and quality of works through better collaboration of stakeholders and having a centralised repository of information. Several countries in Western Europe, North Americas, Asia, and other parts of the world have already adopted the use of BIM. It is a project management tool. It encompasses all aspects of project management. However, it requires involvement and competency of stakeholders to be effective.

Read More »
Schedule Risk Analysis by MLR

Schedule Risk Analysis With Acumen: Effects of Floats And Lags on Results

In this analysis, the effects of the schedule total floats and lags on SRA results are investigated. Four simple schedules were developed using Primavera P6 to understand how results varied when the same single risk was applied to a critical activity, non-critical activity, and to an activity whose criticality was driven by a lag.

Read More »