Dashboard: Solar PV Installations In Australia

Share
Tweet
Share
Power Bi Dashboard by MLR

Australia sits atop the world as the leader in the installed solar PV systems.  About 1 in every 3 dwellings in the country has solar panels installed.  The dashboard provides a rich collection of data carefully put up together to provide an interactive source of information pertaining to the solar PV state of the country including a predictor tool to forecast the installation quantity based on several relevant parameters as determined by regression analysis.

The Solar PV Dashboard

Share
Tweet
Share
MLR Project Management & Consultancy | TIA | Delay Claims

Why Time Impact Analyses Fail: Lessons from a Recent Delay Claim Review

A forensic schedule review revealed that a contractor’s claimed 69‑day delay was unsupported. After correcting the schedule selection, isolating logic changes, and validating against actual progress, the final outcome was zero days of delay—demonstrating the importance of rigorous methodology and real‑world alignment in Time Impact Analyses.

Read More »
MLR Project Management & Consultancy

Rationalizing the Irrationalities in Decision-Making

Traditionally, decision-making was seen as a rational process governed by logic, with emotions viewed as disruptive. Yet, recent studies reveal emotions are essential to organizational decision-making, especially in complex scenarios. Emotions, distinct from moods, shape judgments and persist beyond the moment, influencing future decisions. They act as motivators and guide adaptive choices, with both immediate and anticipated feelings present throughout the process. Neuropsychological research further shows that lacking emotional input can impair decision quality, even if rational skills remain strong. Ultimately, emotions and rationality are intertwined, both crucial for effective decisions.

Read More »
MLR Project Management & Consultancy

Mastering Activity Codes in Primavera P6 Schedules for USACE and NAVFAC Contracts: Requirements, Common Pitfalls, and Best Practices

The article outlines the significance of utilizing specific activity codes in Primavera P6 schedules for US government projects, particularly under USACE and NAVFAC contracts. USACE typically requires eight detailed codes, while NAVFAC may only use a subset. The content stresses the necessity of reviewing contracts for compliance and notes potential exceptions. It highlights common mistakes and offers guidance on applying these codes effectively, ultimately illustrating their role in enhancing schedule management and ensuring successful project execution.

Read More »

Build Better Projects With Expert Guidance

MLR Subscription - Browsing

Where to send the file?