A Simple Interactive Project Timeline

Share
Tweet
Share
Interactive Project Timeline

There is no better way to vividly express key events and milestones than to visually presenting them in images.  The Project Timeline does that.  Though developed in Microsoft Excel, it still has the dynamic functionality.  Meaning, displayed photos and other details can be changed as simple as by moving the installed scroll bar.  Its sophistication comes with the relative ease of updating its contents and adding more photos into it.

About

The Project Timeline, which can be downloaded from the link below, is created in Microsoft Excel.  It provides a visual presentation of project events by means of photos, or other illustrative materials for that matter, to better communicate the information intended to be conveyed.  What is special it, compared to typical tools for the same function, is its interactive capability.  The scroll bar in the timeline itself can be adjusted to change the photo displayed.  Each photo is provided with pertinent information such as the date and its description.  These information do change, along with the displayed image, as the scroll bar is moved.

Note that the sample images provided were not really specific to construction key events.  The file was intentionally provided with such images as it could also be used for non-engineering or non-construction purposes.  It can be used to account for special travelled places, schedule activities, planned occasions, etc.

Though the sample Project Timeline looks complicated, it can easily be modified even by beginners in using spreadsheets.  Instructions on how to go about updating the contents are provided below.

Features

The Project Timeline has the following distinctive features that atypical to dashboards build with the same program.

  • It can be utilized not only for construction projects, but also for other office reporting functions as well.
  • The photo can be dynamically changed using the scroll bar neatly placed under the timeline.
  • Pertinent information about the image are provided and these do change too with the displayed photo.
  • Updating of contents can be done with ease (see instructions below).

Get the feel on how the Project Timeline works by downloading it for free!

Project Timeline

Changing Contents Of The Project Timeline

Below are the steps in adding a photo into the Project Timeline (instructional video also available above):

  1. Go to tab “Image” and copy the row of an existing image and paste it to the row immediately below the last image.  Note that the row height should be the same as the existing ones.Project Timeline by MLR Project Management and Consultancy
  2. Right-click on the image and select “change picture.”  Find the image to replace the current one.Project Timeline by MLR Project Management and Consultancy
  3. Note the cell location of the added image.  In this instance, it is on cell “B12.”Project Timeline by MLR Project Management and Consultancy
  4. Go to the tab “Data” and add the description of the photo under the column “Milestones.”Project Timeline by MLR Project Management and Consultancy
  5. Add details of the image such as the date and the cell location.Project Timeline by MLR Project Management and Consultancy
  6. Go to the tab “Project Timeline” and update the range of the scroll bar by right-clicking on it and choosing “format control.”Project Timeline by MLR Project Management and Consultancy
  7. Set the new “maximum value” to 11 (since there are 11 photo contents in total).Project Timeline by MLR Project Management and Consultancy
Share
Tweet
Share
Interactive project planning and controls dashboard using Power BI and Primavera P6 for construction schedule tracking, earned value analysis, Gantt charts, and project performance monitoring.

The Ultimate Project Planning and Controls Dashboard Using Power BI and Primavera P6

Explore a fully interactive Project Planning and Controls Dashboard built using Power BI and Primavera P6. This article demonstrates how modern construction project controls can integrate earned value management, schedule performance tracking, Gantt chart visualization, progress photos, historical schedule submissions, and Window Analysis-based delay analysis into one centralized digital reporting environment. Discover how dynamic dashboards improve project visibility, stakeholder communication, forensic schedule analysis, and decision-making while simplifying monthly reporting workflows for complex construction and infrastructure projects.

Read More »
Project planning and scheduling practices comparison across the USA, UAE, and Australia featuring construction project controls, Primavera P6 scheduling, global infrastructure, and international project management concepts.

How Planning and Scheduling Practices Differ Across the USA, UAE, and Australia

Explore the key differences in project planning, scheduling, and project controls practices across the USA, UAE, and Australia based on real industry experience. This article shares firsthand insights into USACE and NAVFAC scheduling requirements, the fast-paced construction environment of the Middle East, and the contrasting project controls culture in Australia. Learn how schedule management, delay analysis, reporting standards, cost loading, and contractual expectations vary across regions, and discover practical lessons for planners and schedulers looking to work internationally in construction and infrastructure projects.

Read More »

Where to send the file?

Build Better Projects With Expert Guidance

MLR Subscription - Browsing

Where to send the file?